| The Heritage Wharf |
South Pier |
South Pier + mid pier |
North Pier |
North Pier + Mid Pier |
Doltone Loft |
Board Room |
| electrical power (gpo) |
 |
 |
 |
 |
 |
 |
| av information - power (3 phase) |
3 |
4 |
3 |
4 |
1 |
- |
| av patching (floor, perimetre and ceiling) |
 |
 |
 |
 |
- |
- |
| sound system (audio) for speeches |
 |
 |
 |
 |
 |
- |
| video conferencing (6 x ISDN channels) |
 |
 |
 |
 |
- |
- |
| lighting (patchable light outlets) |
3 |
4 |
2 |
3 |
- |
- |
| lighting (control in room and dimmers) |
 |
 |
 |
 |
 |
 |
| highspeed wireless internet access (pre booked) |
 |
 |
 |
 |
 |
 |
| rigging bars and draping track (blackout facilities) |
 |
 |
 |
 |
- |
- |
| in-house staging (4m x 2m) |
 |
 |
 |
 |
 |
- |
| TV reception |
 |
 |
 |
 |
 |
 |
| phone lines (pre booked) |
24 |
32 |
16 |
24 |
2 |
3 |
| height floor to rigging |
4.4m |
4.4m |
4.4m |
4.4m |
- |
- |
| height floor to acoustic walls |
4.25m |
4.25m |
4.25m |
4.25m |
- |
- |